Aluminum Forms
Floor-to-floor building cycle in as fast as 4 days with Aluminum Forms.



Aluminum forms are the most cost effective for buildings with at least 8 typical floors such as condominiums, schools, hospitals, or commercial buildings or projects with a high number of typical units like townhouses and tract housing.
You can complete formworks assembly and do a one-time concrete pour of the walls, slabs, beams, columns, and staircases for one building floor in as fast as 4 days.
If you’re a first time user of aluminum formworks, our technical team is available to oversee the installation of the formworks and your first concrete pour.
Aluminum formworks save you time and money.

Maximum durability. Given proper handling and maintenance Aluminum formworks can be used up to 1000 times and are corrosion-resistant.


When you can lessen the steps, you shorten the project duration which ultimately leads to lower costs.

They can be cast as part of monolithic construction using aluminum formworks. This method is more reliable and cost-effective than the standard practice of pre-casting the architectural details offsite and then affixing them to the structure.


Easy installation of MEPFS. Pipes, cables, wires are embedded in columns, walls, and slabs before concrete casting.

Recyclable. Completely recyclable Aluminum formworks. They help lessen construction site waste and eliminate the cost of periodically clearing it.